Beaver Former BIA School

Preliminary Environmental Assessment in Beaver, Alaska.

NORTECH partnered with the U.S. Fish and Wildlife Service to evaluate environmental and structural concerns at the former BIA School in Beaver. Once the center of community activity, the school and its support buildings had fallen into disrepair, with abandoned fuel tanks, aging infrastructure, and potential hazardous materials requiring assessment.

 

Our team conducted site research, reconnaissance, and environmental sampling to identify petroleum impacts, asbestos, lead-based paint, and other hazardous materials such as PCB ballasts and mercury switches. In addition, NORTECH developed plans for tank demolition, building abatement, and soil remediation, supported by detailed cost estimates and technical reports.

 

Through a combination of hazardous materials investigation, remediation planning, and demolition design, NORTECH delivered a clear roadmap for the Fish and Wildlife Service and the community of Beaver to move the site toward safe cleanup and reuse.

Project Details

Disciplines

Environmental Engineering

Scope Highlights

Hazardous Materials Survey

Environmental Site Assessment

Cleanup & Corrective Action Planning

Project Gallery

Fairbanks

2400 College Road

Fairbanks, AK

99709-3754

Tel: 907-452-5688

Anchorage

3105 Lakeshore Dr. Suite A106 

Anchorage, AK 99517-2815

Tel: 907-222-2445

Juneau

5438 Shaune Dr. 

Juneau, AK

99801-9539

Tel: 907-586-6813

bottom of page