top of page

Chichagof Island Former Cannery

Environmental Assessment in Chichagof Island, Alaska.

NORTECH completed a Phase I Environmental Site Assessment and Hazardous Building Materials Assessment for the former Chatham Cannery property at the southeastern tip of Chichagof Island. Originally constructed as a salmon cannery, the remote property has since been repurposed to provide power generation, caretaker services, and limited fuel sales. The site included multiple standing buildings, collapsed structures, and a tank farm of four 20,000-gallon fuel tanks.

 

In addition to meeting ASTM E1527 standards, NORTECH evaluated potential asbestos-containing materials, lead-based paint, and petroleum-impacted soils. Based on our findings, we recommended a Phase II investigation to further delineate areas of petroleum contamination exceeding regulatory cleanup levels.


This project demonstrates NORTECH’s expertise in conducting environmental due diligence in remote Alaska communities, addressing both regulatory requirements and site-specific concerns to help clients plan safe redevelopment strategies.

Project Details

Disciplines

Environmental Consulting

Scope Highlights

Hazardous Materials Survey

Environmental Site Assessment

Cleanup & Corrective Action Planning

Project Gallery

Fairbanks

2400 College Road

Fairbanks, AK

99709-3754

Tel: 907-452-5688

Anchorage

3105 Lakeshore Dr. Suite A106 

Anchorage, AK 99517-2815

Tel: 907-222-2445

Juneau

5438 Shaune Dr. 

Juneau, AK

99801-9539

Tel: 907-586-6813

bottom of page